Loading...
Loading...

It is a building that consists of three (3) sections: 1. The First is a 5-level building facing Main Street with a total area of approximately 900 m2. It includes administrative area, reception, bathrooms, laboratories, loading and unloading with industrial lift of up to 5000 kg on the ground level, security room, wastewater treatment plant, water tank of 35000 l., parking (285 m2) and container loading area, kitchen and dining areas for employees and workers, 2-bedroom apartment and meeting room. 2. The Second, continuing from the First section, is a Concrete structure with an area of approximately 3150 m2 on 2 levels, the first level with a height of 4.8 m, with its walls lined in white ceramic, loading dock, bathrooms with women's and men's dressing rooms and storage. And the upper level with a Column-free open plan and vaulted ceiling with a height at the center of 6.5 m and 2.85 m at its lower sides, designed to support 1.5 ton/m2 and consists of bathrooms, large storage, 4 cubicles for powder compaction machines, and 2 powder processing rooms. The structure can support an additional floor. 3. The Third section with an area of approximately 450 m2, consists of a 1000 kg lift, water tank of 35000 l., bottle washing area, hydropneumatic system, 15 hp compressor, 2-bedroom apartment for the caretaker, room for 2 electrical generators, 2 storage rooms, storage area for diesel fuel for the electrical generators and access to the roof storage. The Property Document indicates an area of approximately 3000 m2, but with improvements and expansions it is estimated at 4500 m2
